Argentina: Water Plant in Mendoza

Created on: 03 Feb 2016 Last updated: 27 Apr 2017
Project Location
Argentina
Valle de Uco, Tunuyán, Provincia de Mendoza
Primary Industry
Food & Beverage
Investment Amount
$0 to $10 Million
Investment Type
Equity Investment

Project Description

Plant I Shape recently inaugurated. Industrial ship of 700㎡. Surface of area of 2 hectares. Technology of modern equipment of last and advanced generation. Ideal spaces of labor tasks, it possesses laboratory, room of entry of bottles, wash, filling, packing and offices of administration. Systematized of productive line in 4.800 bottles of 2 liters per hour (daily total 230.400 lts.) and 1.000 cans of 6 liters per hour (daily total 144.000 lts.)

Attachments

Disclaimer
The information on this page may have been provided by a contributor to ChinaGoAbroad, and ChinaGoAbroad makes no guarantees about the accuracy of any content. All content shall be used for informational purposes only. Contributors must obtain all necessary licenses and/or ownership rights from the relevant content owner(s) before submitting the same to ChinaGoAbroad for publication. ChinaGoAbroad disclaims all liability arising from the publication of content received from contributors. Links may direct to third party sites out of the control of ChinaGoAbroad, and such links shall not be considered an endorsement by ChinaGoAbroad of any information contained on such third party sites. Please refer to our Disclaimer for more details.
Top