Improvement of 193 km of Highway 5, with expansion of capacity (third lanes) in the areas around the cities of Talca and Chillán and a bypass for Talca. Important repair of existing surfacing, corrections to route to increase speed of traffic flow, new bridges and segments of service roads, improvement of eastwest access through flyovers and new roads. Includes the incorporation of electronic toll collection (free-flow).
Please see the attached or contact anogueira@minrel.gob.cl for detailed info.
Disclaimer
The information on this page may have been provided by a contributor to ChinaGoAbroad, and ChinaGoAbroad makes no guarantees about the accuracy of any content. All content shall be used for informational purposes only. Contributors must obtain all necessary licenses and/or ownership rights from the relevant content owner(s) before submitting such content (including texts, pictures, photos and diagrams) to ChinaGoAbroad for publication. ChinaGoAbroad disclaims all liability arising from the publication of any content/information (such as texts, pictures, photos and diagrams that infringe on any copyright) received from contributors. Links may direct to third party sites out of the control of ChinaGoAbroad, and such links shall not be considered an endorsement by ChinaGoAbroad of any information contained on such third party sites. Please refer to our
Disclaimer for more details.