Improvement of 193 km of Highway 5, with expansion of capacity (third lanes) in the areas around the cities of Talca and Chillán and a bypass for Talca. Important repair of existing surfacing, corrections to route to increase speed of traffic flow, new bridges and segments of service roads, improvement of eastwest access through flyovers and new roads. Includes the incorporation of electronic toll collection (free-flow).
-
Content Types: DealRegions & Countries: ChileIndustries: InfrastructurePower/Utilities...
Expansion to two lanes in each direction of Road 199-CH in the Freire-Villarrica segment, with a length of 48.3 km, continuing with a new 37.3-km road that starts as a bypass around the southwest of the city of Villarrica, goes on to Pucón by a road parallel to the current one which runs alongside the lake and connects with Road 199-CH to the east of Pucón, near the western end of its aerodrome.
-
Content Types: DealRegions & Countries: ChileIndustries: Healthcare
Hospital tenders envisaged for 2019 in Chile
-
Content Types: DealRegions & Countries: ChileIndustries: InfrastructurePower/Utilities...
Improvement of a segment of Highway 5 South, with expansion to third lanes at specific points, repair of existing surfacing, corrections to route, replacement of old bridges and some segments of service roads. Also includes improvement of northern and southern access roads to the city of Valdivia and the expansion of specific roads to two lanes in each direction. Includes the incorporation of electronic toll collection (free-flow).
-
Content Types: DealRegions & Countries: ChileIndustries: Power/Utilities
Located in the Ñuble Region, this project consists of a concrete face rockfill dam (CFRD), with a concrete slurry wall on its upstream side. Height of wall: 85 m; length of upper edge: 430 m; area flooded: 424 ha; area of irrigation: 10,000 ha.
-
Content Types: DealRegions & Countries: ChileIndustries: InfrastructurePower/Utilities...
Third lanes between the exit from Casablanca and the Zapata Tunnel, between Peñuelas and junction to Viña del Mar, between Viña del Mar junction and Rodelillo and in the urban segment of the highway entering Valparaíso. Also includes crossings for connection with local roads, segments of local asphalt roads, expansion of the Vespucio junction, new Lo Prado and Zapata Tunnels and improvement of the Agua Santa descent as well as free-flow toll...
-
Content Types: DealRegions & Countries: ChileIndustries: InfrastructurePower/Utilities...
Improvement of 75 km of trunk road. Includes expansion of the road platform, repair of the existing surfacing, corrections to the route, new bridges and segments of service roads as well as replacement of road safety elements and installation of signage where required. Incorporation of electronic toll collection to be defined.
-
Content Types: DealRegions & Countries: ChileIndustries: AgribusinessPower/Utilities
Located in the Valparaíso Region, this project consists in the construction of a principal wall of the concrete face rockfill dam (CFRD) type, compacted with a concrete slurry wall upstream. Also includes a 25-km feeder canal to carry water from the basin of the Aconcagua River to the reservoir, which will provide irrigation for 26,577 ha.
-
Content Types: DealRegions & Countries: ChileIndustries: InfrastructurePower/Utilities...
Construction and operation of a tram to connect the neighboring cities of Coquimbo and La Serena, along an exclusive 14-km corridor. Includes 14 tram stops and 6 intermodal stations.
-
Content Types: ArticleRegions & Countries: ChileIndustries: Infrastructure
Chile: Infrastructure Plan 2018 - 2023